Will any single datacenter campus reach 2 GW of power capacity by the end of 2027
2
Ṁ100Ṁ132027
46%
chance
1H
6H
1D
1W
1M
ALL
Question: Will any single contiguous datacenter campus reach ≥2.0 GW of commissioned critical IT load on or before December 31, 2027?
Scope: A contiguous campus is a unified parcel under a single primary operator; multiple buildings sharing primary power/network infrastructure count as one. Multi-tenant regional parks (e.g., Hohhot) are excluded.
Metric: Commissioned critical IT load — power provisioned (grid or on-site generation) and capable of drawing for compute on the resolution date. Announced/future phases and un-energized shells don't count.
Source: Epoch AI's Frontier Data Centers dataset as primary; SemiAnalysis Datacenter Model as tie-break/corroboration.
This question is managed and resolved by Manifold.
Market context
Get
1,000 to start trading!
People are also trading
Related questions
Will any single datacenter PPA ≥1GW be announced by a hyperscaler before 2026-12-31?
65% chance
When will there be ≥10GW of data center capacity in space?
Will US datacenter electricity demand exceed 6% of total US electricity by year-end 2026?
38% chance
Will data centers consume more than 10% of US electricity usage by EOY 2028?
65% chance
Will there be 1GW of orbital data center compute by EOY 2031?
Will U.S. data center electricity consumption exceed 10% of total U.S. power demand by end of 2030?
45% chance
When will the first orbital data center with ≥1 MW of compute power become operational?
Will there be a functional ≥100MW data center in space before 2031?
36% chance
Will Lumen Orbit have at least one functioning megawatt-scale data center in space by the end of 2027?
2% chance
Will there be over 1 GW of data center on the moon by EOY 2032?
17% chance