Which option will LA Metro choose for the Sepulveda Transit Corridor?
7
Ṁ2kṀ5k
resolved Jan 23
100%94%
Alternative 5 (automated heavy rail under the Santa Monica mountains, underground in the Valley)
1.0%
Alternative 1 (aerial monorail along 405)
1.0%
Alternative 3 (aerial monorail along 405 with partial tunneling)
2%
Alternative 4 (automated heavy rail under the Santa Monica mountains, aerial in the Valley)
1.5%
Alternative 6 (driver-operated heavy rail under the Santa Monica mountains, underground in the Valley)
0.8%
No build

There are currently 6 options being considered: 3 that involve tunneling a subway from UCLA to the San Fernando Valley, and 2 that involve a mostly above-ground monorail along the 405. There were originally 6 options, but "Alternative 2" has already been eliminated.

Under CEQA, LA Metro also has to study a no-build options, which would mean the project doesn't go ahead.

If an alternative hasn't been chosen by the close date, I'll extend.

Related market:

Market context
Get
Ṁ1,000
to start trading!

🏅 Top traders

#TraderTotal profit
1Ṁ1,301
2Ṁ223
3Ṁ47
4Ṁ22
Sort by:

@elderlyunfoldreason I'm leaning toward resolving to alternative 5 because the chosen alternative is described as a modified alt 5. However, there's an argument to be made that alt 6 is also valid because the modified alt 5 incorporates parts of alt 6.

Any strong opinions on whether I should resolve to just alt 5 vs. alt 5 AND alt 6?

@zQ4Z82W The characteristics you described for alt 5
> automated heavy rail under the Santa Monica mountains, underground in the Valley

most closely match what was chosen.

Whereas alt 6's do not:
> driver-operated heavy rail under the Santa Monica mountains, underground in the Valley

So if this was my market I would just do alt 5.