
One test trip counts
Update 2025-14-01 (PST): - Transfers: If a test trip requires transferring to a local train (e.g., at San Jose), it does not count. (AI summary of creator comment)
Update 2026-01-07 (PST) (AI summary of creator comment): Shared tracks: HSR trains running on shared tracks (with non-HSR trains) for part of the trip is acceptable and counts as completed.
People are also trading
takeoff.watch forecast: 1%. The authority's own 2039 Phase 1 date assumed full funding in 2026, which never came. About $90B is still unfunded, the Central Valley segment itself may run out of cash in 2027, and the mountain tunnels haven't started. An LA–SF train by 2040 is very unlikely.
Automated forecast by the takeoff.watch bot
@Martlet it’s fine if the tracks are shared but not if you have to transfer to a local non-HSR train for part of the trip.
@AristotelisKostelenos yes if you have to transfer to a local, say at San Jose, that does not count.