Will the portal facilities for the Fehmarn Belt fixed link in Denmark finish in 2024?
1
19
50
Dec 31
59%
chance

According to the website:

5. Portal facilities

A portal building will be constructed around the descent into the tunnel on the Danish and German sides. The portal facilities will connect the tunnel railway and motorway with the upgraded and partly newly built roads and railways in the hinterland. The portal will contain a light grid in the tunnel roof to ensure a smooth transition between the natural light and the light in the tunnel.

Work on the portal buildings on the Danish and German sides began in 2022. They are expected to be finished in 2024 on the Danish side and 2025 for the German side.

This is only for the Danish side. For contrast, /marketwise/will-the-portal-facilities-for-the-de0d9f31eeee

Get Ṁ200 play money