This market resolves based on SpaceX’s reported Nameplate Compute Draw as of December 31, 2027.
“Nameplate Compute Draw” should use SpaceX’s then-current reported definition. As currently defined by SpaceX, it is based on installed GPUs multiplied by their respective all-in power draw and excludes facility-level overhead such as cooling, power-distribution losses, lighting, and security.
The figure should include all qualifying compute capacity owned or operated by SpaceX or xAI, whether:
- terrestrial or space-based;
- used internally; or
- sold, leased, or otherwise provided to third-party customers.
The preferred resolution source is SpaceX’s 2027 Form 10-K or another official SpaceX SEC filing reporting the figure as of December 31, 2027. If SpaceX stops reporting the metric under that exact name, the market should use the closest directly comparable officially reported metric.